SEMI-MOBILE PLANT, CANTON GLARUS (CH) 2019-2020

3D drawing of the project management of the wastewater treatment plant for:
– dirty laundry
– treatment of demolition material
– landfill

The site is a landfill site for the treatment of inert and excavated earth.

Plant capacity = 40 ton/h

The plant consists of:

  • Pre-treatment mobile screen, mobile crusher consisting
  • Charging line
  • Bodenwischer
  • Drainage – Facilities
  • Desander with cyclones (for two sand fractions)
  • Material transport belts
  • Magnetic separator
  • Drum pre-screen 0.5mm
  • Double high clarifier
  • Flocculant preparation and dosing
  • Filter Press
  • Process, dirty water, clean water basin
  • Complete system control Siemens S7 with Remote Control
  • Dov. Piping, fittings

We executed:

  • Complete project
  • Cost evaluation
  • Planning